Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 人妻少妇av中文字幕乱码牛牛 | 波多野结衣无码在线观看 | 欧美喷潮久久久久的广告语 | 婬乱欧美一二三区 | 亚洲中文字幕电影网站免费观看 | 四川少妇BBB搡BBBB槡BBBB 2019中文字幕在线电视剧免费观看 | 1000部毛片A片免费观看 | 一区二区三区免费观看完整版日漫 | 欧美日韩在线一区 | 三亚三色黄A片免费看 | 久久精品熟女亚洲AV麻豆蜜桃 | 无遮挡又大又圆的少妇视频 | 四虎精品免费成人 | 国产成人自拍视频网站 | 国产91无码精品秘 入口! | 日本理伦少妇1做爰 | 午夜自产精品一区二区三区游乐网 | 日韩高清毛片在线观看 | 音影先锋男人色色资源网 | 亚洲无码午夜电影在线观看 | 日本理论片午夜理伦片 | 四季精品无码一区二区三区四区 | 成年人网站一区二区三区 | 影音先锋在线观看资源网 | 国产精品人妻无码久赖草 | 牛牛超碰色资源站 | 黄色成人免费观看视频 | 丰满人妻久久一区二区三区69 | av福利在线观看不卡 | 欧美性受XXXX中国XYX性爽 | 亚洲午夜精品一区二区 | 国产av一区二区新妻精品 | 国产人妻与黑人3p在线 | 网站黄色在线观看 | 好男人www.久久| 中文字幕人妻少妇 | 国产精精精精精精 | 日本韩国三级美妇 | 无码午夜精品一区二区三区视频 | 国产秘 精品一区二区三区 摸摸摸BBB毛毛毛片 |