Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 黄色免费在线网站17c | 日韩一级无码内射 | 殴美一级片在线观看 | 亚洲国产精品无码 | 国产一区二区三区在线无码观看 | 波多衣野结衣一区二区三区 | 视频区 图片区 小说区免费 | 手机在线观看AV | 成年人免费在线观看的视频 | 国产做爰14XXXⅩ高潮电影 | 欧美色图中文字幕 | 成年视频免费黄网站在线观看 | 午夜精品A片一区二区三区老狼 | 全免费A级毛片免费看1 | 日日噜噜夜夜爽爽爽 | 亚洲无码AV电影 | hs在线中文字幕视频观看网站 | 特级西西444www无码视频免费看 | 欧美黑人BBBB精品 | 国产高清免费不卡一区二区三区在线 | 东北少妇bbbb | 特极午夜电影视频录相 | 18禁网站禁片免费观看 | 黄色视频在线观看免费播放 | 动漫3D精品一区二区三区乱码 | 亂伦国产一区二区七猫 | www.eeuss| 国产成人AV无码精品 | 少妇伦子伦精品无码 | 亚洲成人无码三级 | 欧美精品一区二区少妇免费A片 | 2019中文在线高清观看电视剧 | 国产麻豆妍希在线观看视频的 | 福利姬视频在线免费 | 亚洲在线在线观看免费高清 | 91人精品妻入口 | 福利姬Jk丝袜-91Porn | 国精产品秘 福利姬入口 | 日日人人xxxx | 色欲av伊人久久大香线蕉影院 |